Customer Benefit - Hospital Investors
Cost reductions even in material procurement
Thanks to the use of intelligent software as early as in the planning stage, all of the required components can be selected to fit perfectly.
This prevents an over-sizing of the power distribution as whole. The building contractor can already attain cost savings when procuring the hospital’s power installation equipment.
Time is saved when power distribution components are installed
Well-matched products and systems ensure a fast installation of the power distribution components, this way guaranteeing a safe start of hospital operation.
This facilitates an early opening of the hospital ahead of schedule and helps the investor to gain time and money.
Reducing unproductively used areas within the building
Low space requirements for the electrical infrastructure in the hospital by exact system sizing with particularly compact and thus space saving products.
Contact: www.siemens.com/tip